The project proposes a permanent dewatering roll-off receiving station at the Metro WWTP. The Metro WWTP is currently using a temporary location and configuration to receive City sewer-maintenance vacuum trucks,…
Read More
This project proposes a permanent storage and feed system for magnesium hydroxide slurry for treatment Train 2 at the Metro WWTP. Currently, Train 2 has a temporary magnesium hydroxide chemical…
Read More
As part of the City's Capacity Assurance Program (CAP) required under the EPA's May 2014 Consent Decree, the City has determined that a new Smith Branch Pump Station (SBPS) is…
Read More
Relocation of approximately 1,100 LF of 8-inch gravity sewer and 200 LF of 2-inch sewer force main, along with multiple lateral lines and manhole adjustments.
Read More
The project is planned to provide 1 Megawatt AC of solar power generation on City property located at the Metro Wastewater Treatment plant next to I-77. The power system would…
Read More
SCDOT proposes to widen Leesburg Road from 719 feet west of S-88 (Fairmont Road) to 705 feet east of S-37 (Lower Richland Boulevard), a distance of approximately 3.9 miles. The…
Read More
This project includes sewer relocations associated with the widening of Leesburg Road from near Fairmont Road to near Lower Richland Boulevard, a distance of approximately 3.9 miles.
Read More
This project includes modifications at the Metro WWTP to upgrade existing sludge thickening facilities that have reached the end of their useful service life and are performing at a substantially…
Read More
This project consists of the installation of a new 48-inch diameter gravity relief sewer in the Lower Gills Creek system for a distance of 6,500 linear feet. The new pipe…
Read More
This project initially involved designing the rehabilitation of the previously abandoned 36-inch pipe (approximately 7,860 linear feet) from manhole 26258MH near Interstate 20 and Brickyard Road to manhole 24390MH. This…
Read More