During a fiscal year, a number of small emergency projects arise and are generally unknown at the start of the budgeting cycle. A project budget is needed to cover these…
Read More
Extend the existing Shady Lane force main to the 24-inch sewer main.
Read More
This project will construct a new maintenance and storage building.
Read More
SCDOT Fairfield Rd Bridge Replacement Utility Relocation.
Read More
The Major Sewer Pipe Rehabilitation CIPP Project consists of 24 separate “groups” located throughout each of the eight sub-basins within the City. The project consists of approximately 74,000 linear feet…
Read More
This project involved evaluating Pump Station (PS) improvement alternatives and preparing a Preliminary Engineering Report (PER). The preliminary PER findings indicate that the PS may be adequately sized but is…
Read More
The aging sewer system, increased number of work orders, I&I, and SSOs have made this sewer basin a priority for rehabilitation. This basin was selected in accordance with the EPA-approved…
Read More
This project consists of the investigation of Crockett Road, Atlas Road and Versch Lock Lift Stations, including all equipment and components, operating conditions, aesthetics, existing capacity and potential future capacity…
Read More
This project proposes the replacement of sanitary sewer piping to upsize the existing pipe from Manhole 01714MH to Manhole 01488MH for a distance of approximately 2,700 linear feet of 18-inch…
Read More