The Major Sewer Pipe Rehabilitation CIPP Project consists of 24 separate “groups” located throughout each of the eight sub-basins within the City. The project consists of approximately 74,000 linear feet…
Read More
SCDOT Fairfield Rd Bridge Replacement Utility Relocation.
Read More
This project includes miscellaneous improvements at the Mill Creek Pump Station: replacing the four existing dry-well pumps and installing new programmable logic controllers (PLCs) and variable-frequency drives (VFDs); installing an…
Read More
Relocation of approximately 1,500 feet of 8-inch, 10-inch, and 18-inch gravity sewer lines and appurtenances.
Read More
This project proposes the replacement of sanitary sewer piping to upsize the existing pipe from Manhole 01714MH to Manhole 01488MH for a distance of approximately 2,700 linear feet of 18-inch…
Read More
The aging sewer system, increased number of work orders, I&I, and SSOs have made this sewer basin a priority for rehabilitation. This basin was selected in accordance with the EPA-approved…
Read More
This project consists of the investigation of Crockett Road, Atlas Road and Versch Lock Lift Stations, including all equipment and components, operating conditions, aesthetics, existing capacity and potential future capacity…
Read More
Resolve utility conflicts on an as-needed basis and use this CIP as the funding source.
Read More