The improvements during this Consent Decree Early Action Project (EAP) to the Broad River Pump Station addressed the existing hydraulic, electric, structural and HVAC deficiencies and increased the station's pumping…
Read More
The Disinfection Improvements for the Metro WWTP Consent Decree Early Action Project (EAP) have eliminated plant dependence on hazardous gaseous disinfection chemicals and aging gas feed equipment, which posed a…
Read More
The upgrades to Columbia Metro WWTP's Final Clarifiers (Numbers 1-10) in this Consent Decree Early Action Project (EAP) allowed the City to meet SCDHEC's effluent requirements and increase efficiency and…
Read More
The Columbia Metro WWTP Influent Pump Station and Preliminary Treatment Facility Consent Decree Early Action Project (EAP) involved the design and construction of a new 150 million gallon per day…
Read More
Miscellaneous improvements at the Broad River Pump Station, including replacement of the four existing dry-well pumps with new PLCs and VFDs; installation of an HVAC system for the entire first…
Read More
This project proposes a 36-inch diameter extension of the existing Saluda River Force Main in order to relocate the force main outfall into the City’s gravity sewer system. The proposed…
Read More
This project provides Train 2 aeration and dewatering system upgrades, including a centrifuge, controllers, and blowers.
Read More
SCDOT proposes to widen Leesburg Road from 719 feet west of S-88 (Fairmont Road) to 705 feet east of S-37 (Lower Richland Boulevard), a distance of approximately 3.9 miles. The…
Read More
The project is planned to provide 1 Megawatt AC of solar power generation on City property located at the Metro Wastewater Treatment plant next to I-77. The power system would…
Read More
Relocation of approximately 1,100 LF of 8-inch gravity sewer and 200 LF of 2-inch sewer force main, along with multiple lateral lines and manhole adjustments.
Read More